Factory

Our factory is situated in the south-east part of Bulgaria near the city Sliven. We are 15 km away from highway “Trakia” and 100 km away from Burgas sea port.

The factory consists of 3 buildings with a total area of 3500 square meters. We are equipped with latest generation machines that guarantee precision and speed of production.

  • 2 CNC milling machines (4 axis Weeke and 5 axis SCM)
  • 2 four side moulders (SCM and Sicar)
  • 3 Calibration sanding machines (Butefering and SCM)
  • Gluing presses (Orma Machines)
  • Circular saws (Felder, SAC, Putsch Meniconi)
  • CNC Turning machines
  • Different Moulders
  • 2 Kilns with automatic control of the drying process